EllaLink EllaLeaks S01E06 – Building a robust landing infrastructure in Sines

EllaLink is building a telecom infrastructure directly connecting Europe & Latin America Sines, Portugal, the city of Vasco da Gama was the place chosen by EllaLink to land its submarine cable. The EllaLink Sines HDD operation took place in a selected area of low impact in Sines, next to the proposed beach manhole. To a punch out point at 650m under the sea at approximately 12m water depth, so that a cable ship would be able to manoeuvre into position and feed the cable into shore.