EllaLink EllaLeaks S01E09 – Landing in Madeira

EllaLink has successfully landed its express submarine cable in Madeira, Portugal on the 22nd of January 2021. The dedicated infrastructure of the Madeira branch is a common project between EllaLink and EMACOM The EllaLink cable incorporates technology capable of providing the most advanced submarine telecommunication system with 30Tbps of potential capacity. The dedicated cable connecting Madeira and the Portugal mainland has approximately 1.100 kilometres. The underwater optical system will allow a high capacity and low latency connection between Lisbon and Funchal.