EllaLink announces footprint expansion to Start Campus
EllaLink announces the expansion of its network to the Start Campus SINES DC, in Portugal. This strategic move strengthens EllaLink’s presence within the Sines Atlantic Hub, reinforcing the partnership with the largest Data Centre being rolled out in Europe.
EllaLink’s new fibre route to Start Campus through the 1.2 GW capacity SINES DC, offers customers reaching the Iberian Peninsula enhanced connectivity, reduced latency, and access to a global network. Start Campus, through the SINES DC project, is enabling a sustainable and interconnected digital ecosystem. This green hub empowers robust interconnection capabilities, benefiting both the tech industry and the local economy.
EllaLink’s fibre network expansion is clearly reinforcing global connectivity. Through this new expansion, Start Campus SINES DC customers will be able to connect to an 8.000 km optical backbone between Continental Europe, Africa, LATAM and soon to the recently announced French Guiana, one of the outermost European regions.
Start Campus SINES DC customers will benefit from EllaLink’s global network with enhanced connectivity in an ultra-low latency between several Atlantic landings, representing faster data transfers and improved application performance, providing customers opportunities to reach new markets and grow their businesses.
“We are thrilled to expand our network to Start Campus,” said Diego Matas, Chief Operations Officer at EllaLink. “This partnership aligns with our commitment to providing innovative and reliable connectivity solutions. By connecting to Start Campus, we are strengthening our local presence in Portugal and offering our customers even more opportunities to grow their businesses.”
With this expansion, EllaLink continues solidifying its position as a leading provider of submarine cable solutions, connecting continents and driving digital transformation.
About SINES DC
The SINES DC, developed by Start Campus, is a 1.2 GW data center campus in Portugal, and one of Europe’s largest and most sustainable data ecosystems with market-leading global connectivity. SINES DC provides maximum optionality for customers with powered shell, turn-key and build-to-suit solutions. The company’s advanced offer is AI-ready and addresses the future needs of the industry by integrating liquid cooling technologies into its flexible and scalable design. With a total combined investment value of €8.5bn, the project is set to use 100% renewable energy and targets an industry-leading PUE of 1.1. Start Campus will be Net Zero by 2030. For more information, visit www.startcampus.pt.
You May Also Like
NEW: EllaLink and EXA Infrastructure partner to offer diverse transatlantic capacity from South America to Europe
EllaLink, the high-capacity fibre-optic submarine cable directly connecting Europe with South Americ
Cooperation agreement with GlobeNet expands EllaLink’s international network in Fortaleza
EllaLink is announcing a new agreement with GlobeNet, allowing simplified customer access in both i
EllaLink reinforces the importance of direct high capacity fibre optic cable connection between Brazil and Europe
New submarine route went live in June 2021, reducing latency, data travel time between two points, a