Find more about

Ongoing Projects

French Guiana

Branch length

2100 KM

 

Goal

The lum@link system developed with SPLANG aims at securing connection between French Guiana and Continental Europe, creating a new high-capacity and low latency route allowing all the Caribbean region to directly connect to Europe and Brazil bypassing North America.

 

Status

In construction RFS 2026

Olisipo System

Branch length

400 KM

 

Goal

The Olisipo cable system will enhance Portugal's connectivity by linking Sines with the Lisbon Metro Area. This connection will support the burgeoning data generated by Sines' data centres and provide a secure, reliable route that complements existing terrestrial infrastructures. Olisipo will support the transformation of Sines into a prime location for data centre development and a key connectivity hub in Europe.

 

Status

In development

Mauritania

Branch length

670 KM

 

Goal

This project developed with the Islamic Republic of Mauritania aims at building an open submarine system enabling end-to-end connectivity between Mauritania and Madrid and facilitating interconnection of local operators with major data exchange networks at reduced costs.

 

Status

In development